← All tests
CUTMultitasking
Cognitive Updating Test
Holding several jobs in your head at once and switching to whichever is drifting out of tolerance.
Included with a plan
Sign in to run this test
This is one of the subscriber tests. Sign in to your account to run it — or try the free tests first, no account needed.
What this test involves
- You have 2 minutes. Keep every display in tolerance.
- Two screens, six displays — set each screen to whatever needs you.
- Engine drains one tank at a time; switch the ON tank to hold levels within 50 L.
- Work the hydraulic pump to hold pressure in the green band, and enter the comms code before it times out.
- The warning panel lists everything demanding action. Keep it empty.
